Car Rubber Radiator Upper Hose Inlet 16571-11050

Car Rubber Radiator Upper Hose Inlet 16571-11050

  • Brand: KUAYU
  • Product origin: Qinghe, Hebei
  • Delivery time: As the Quantity
  • Supply capacity: ≥500pcs
  • High-quality raw material
  • Highly durable
  • Logo customized on request
  • Excellent resistance to a range of chemicals
  • Easy to install

Email

Car Rubber Radiator upper Hose inlet 16571-11050

  • Highly strong and durable
  • Wide range of diameters available

Introduction:

OE numbers: 16571-11050

Manufacturer brand: Toyota Corolla AE101R EE90 AE90 CE90 1.3 89-99 

rubber radiator hose

Specification:

Product Type

Car Rubber Radiator upper Hose inlet 16571-11050

Material

EPDM

Wall Thickness

3-5mm( +/-0.2mm)

Polyesters

2-4plys

Operating Temperature

-40℃~+250℃

Working pressure

≥0.4MPA

OEM/ODM

Accept

Sample

Free

Application

Turbocharger, Intercooler, Intake pipe and Exhaust pipe, Cooling system, Heating system

Application market

Cars, Trucks, Buses, Modified cars, Heavy machinery, Construction machinery, Ships, etc.

Product Details:

Car Rubber Radiator Upper Hose Inlet 16571-11050 - product imageCar Rubber Radiator Upper Hose Inlet 16571-11050 - product image

Why Choose Us:

rubber radiator hose

Production Process:

clear rubber pipe

Testing Equipment:

28mm rubber hose

Exhibition:

rubber radiator hose

Packing:

clear rubber pipe

FAQ:

1. How can we guarantee quality?

Always a pre-production sample before mass production;

Always final Inspection before shipment;

2. What can you buy from us?

Silicone Hose,Radiator Hose,Turbo Hose,Air Intake Hose,Car Rubber Seal

3. Can it be customized?

According to the demand,we can customize the product size,color,logo and the number of layers of reinforcement layers.Please let us know the medium passing through the hose,water,air or oil,we can use different silicone materials to meet your needs.

4. Do you accept OEM service?

Yes,OEM can be provided.

5. What's the Delivery Time?

Usually, It's 15 days to 20 days.The samples will be sent immediately by the air express in 3 days if the goods are in stock. Please Confirm With us before Order.

6. What's the Payment Terms?

Usually,30% as deposit, 70% before shipment by T/T.Western Union acceptable for small amount.T/T, and L/C is acceptable for large amount.

7. Can I visit your factory?

Yes, of course. welcome.